Tallies

This section discusses bringing pipe on and off of racks. Tally in, Tally out, and miscellaneous tallies are covered.

Tally IN
This is the process for receiving new pipe. Tally IN is an entry and archive file, which can recall old Tallies even after the pipe has subsequently left th...
Tue, 28 Jan, 2014 at 1:12 PM
Tally OUT
A Tally OUT is used to move pipe off of a rack and typically out of your yard.   The Tally OUT screen is shown below.     The first thin...
Sun, 6 Jul, 2014 at 9:46 AM
Miscellaneous Tally OUT
A Misc. Tally Out is identical to a Tally Out except that a misc. out allows you to break the FILO rule (first in last off) and remove joints from any tier ...
Tue, 7 Jan, 2014 at 11:35 AM
Transfer pipe to a different rack, stockcard, or owner.
A transfer tally links a tally out with a tally in, allowing you to quickly and accurately move pipe to a new rack or owner.  This process is also very help...
Thu, 30 Jan, 2014 at 3:11 PM
Misc Transfer Tally
A Misc Transfer Tally is identical to the Transfer Tally with the exception that a Misc Tally Out is used instead of a Tally Out.  A misc. out allows you to...
Tue, 7 Jan, 2014 at 12:03 PM
Change Rack Pipe Definitions with Joints on the Rack
The following will walk you through the steps necessary to change pipe definitions for the entire inventory on a rack along with the rack itself. If the ...
Thu, 30 Jan, 2014 at 3:26 PM
Transfer Rack and Stockcard to New Owner
The following will walk you through the steps necessary to change ownership of the entire inventory of a rack along with the rack itself. If the new owner o...
Thu, 30 Jan, 2014 at 3:27 PM